Construction Costs for House

Construction Costs for House

The estimated total cost for constructing a 100 sq. yds. ground-floor house ranges from ₹18 lakhs to ₹35 lakhs This comprehensive guide outlines the phase-wise breakdown, material expenses, labour costs, and additional factors to consider.

Phase-Wise Breakdown Construction Costs for House

1. Design and Planning (5%): ₹0.9-1.75 lakhs

 – This initial stage involves hiring architects, engineers, and designers to create a customised blueprint for your dream home.

2. Site Preparation (10%): ₹1.8-3.5 lakhs

 – Site preparation encompasses clearing the land, excavating, and levelling the ground to ensure a stable foundation.

3. Foundation and Structure (40%): ₹7.2-14.2 lakhs

 – Constructing the foundation and structure is crucial, involving laying the groundwork, building columns, and installing roofing.

4. Utility Installation (15%): ₹2.7-5.3 lakhs

 – Installing essential utilities such as plumbing, electrical systems, and HVAC ensures a functional and comfortable living space.

5. Finishing Touches (30%): ₹5.4-10.5 lakhs

 – The final stage involves adding finishes like flooring, painting, and fixtures to make your house a home.

Material Expenses for Construction Costs for House

1. Cement: ₹0.75-1.5 lakhs

2. Steel: ₹1.2-2.4 lakhs

3. Bricks: ₹0.6-1.2 lakhs

4. Sand: ₹0.3-0.6 lakhs

5. Aggregate: ₹0.3-0.6 lakhs

6. Woodwork: ₹1.2-2.4 lakhs

7. Electrical: ₹0.6-1.2 lakhs

8. Plumbing: ₹0.3-0.6 lakhs

9. Flooring: ₹0.6-1.2 lakhs

10. Painting: ₹0.3-0.6 lakhs

Labour Costs Construction Costs for House

1. Masonry: ₹1.2-2.4 lakhs

2. Carpentry: ₹0.6-1.2 lakhs

3. Electrical: ₹0.3-0.6 lakhs

4. Plumbing: ₹0.3-0.6 lakhs

5. Painting: ₹0.3-0.6 lakhs

Additional Factors to Consider Construction Costs for House

1. Location (urban/rural): Urban areas typically have higher construction costs due to increased labour and material expenses.

2. Material quality (standard, high-end, luxury): Choosing premium materials significantly impacts overall costs.

3. Labour rates (skilled/unskilled): Hiring skilled labour increases costs but ensures better quality.

4. Design complexity (simple, moderate, complex): Intricate designs require more materials and labour, raising costs.

5. Local regulations and taxes: Compliance with local building codes and taxes adds to the overall expense.

Timeline

1. Planning and design: 1-3 months

2. Site preparation: 1-2 months

3. Foundation and structural work: 3-6 months